INSTALLED CAPACITY: 288.000 288,000 man-hours/year.
PRODUCTION CAPACITY: 42 metric tons / month.
MACHINERY AND EQUIPMENT MAXIMUM CAPACITIES.
  • Guillotine cutting: 25 mm thickness x 3,000 mm width
  • Torch cutting: 150 mm thickness .
  • Saw cutting: 600 mm.
  • Plasma cutting: 25 mm. thickness.
  • Cylinder Roller: 25 mm. thickness x 3,000 mm width
  • Numerical Control Drill: "CASER 80" area capacity 1,500 mm. x 1,500 mm
  • Numerical Control Drill “GSP”: Area capacity 1,100 mm x 1,000 mm.
  • Radial Drill "MAS": 4 m swing.
  • (5) Radial Drills: 3500 mm.
  • Strip Rollers: max height 300 mm.
  • Tube Bender: max diameter 6”
  • Folding Machine: 5/8” thickness x 3,000 mm width.
  • Mobile Lift: 20 Tons (for heavier equipment we lease cranes, so weight is not a limitation).
  • Vertical Hydraulic Press: 200 Tons.
  • Horizontal Hydraulic Press: 500 Tons.
  • Universal Rectifier: 3 mt length x 1 m turn Mandrill Press: W.H. 80”.
  • Vertical Shaping Machines: ø3000 mm x 4000 mm h/0 1066 mm
  • (8) Horizontal Shaping Machines: 4000 mm h. / �1066 mm.
  • Manual and Semi-automatic Welders (20 macchine)
  • Sandblasting and Painting.

    NOTE: Total drilling capacity of 900 kg/day in tubular plates, stainless steel and similar ones.

  • STAMPING CERTIFICATES.
  • ASME Stamping

    INTEVEP Approval (Nov. 1995): B Status

    ESTIMATED DELIVERY TIMES.
  • MANUFACTURE DRAWINGS: Four (4) weeks (approx) from Purchase Order.
  • MATERIALS PURCHASE: Two (2) months maximum, be it domestic or international purchases.
  • ESTIMATED DELIVERY TIME OF EQUIPMENTS / STANDARD DIMENSIONS.

  • - HEAT EXCHANGERS (10 Metric Tons):
    five (5) months.
    - AIR COOLERS (10 Metric Tons): four (4) months.
    - COLUMNS (15 m. Tons., 02 m., h 20 m): six (6) months.
    - PRESSURE VESSELS (20 Met Tons, 03 m): three (3) months.

    MANUFACTURE STANDARDS.
  • COVENIN -ANSI
  • TEMA -ASTM
  • AWS -API
  • AISI -ASME


  • QUALITY CONTROL.
    SELF
    - Penetrating Liquids
    - Hydrostatic Tests
    - Pneumatic Tests
    - Hardness meter
    - Thermal treatment


    RENTED
    - X Rays
    - Magnetic Particles
    - Ultrasound.


    WELDING PROCEDURES.
  • According to ASME Codes:
    - P1 P1 / P8
    - P3 P4/P8
    - P4 P1/P4
    - P8
  • Who we are? | Activities | What we produce? | Last Jobs | Portfolio | Instalations | Contact us | Home
    Español      Inglés       Italiano      Holandés
    © Copyright 2005. tallercomercio.com. All Right Reserved. Produced by